Fort Carson guard booth modernization improves security and quality of life for Soldiers

29 min ago
Category
Military affairs
Source
U.S. Army Corps of Engineers Engineering and Support Center, Huntsville
Military AffairsOfficial statement

At a glance

What
Military Affairs
Who
U.S. Army Corps of Engineers Engineering and Support Center, Huntsville
When
Nov 20, 2026 at 4:32 PM UTC

Statement from U.S. Army Corps of Engineers Engineering and Support Center, Huntsville, November 20. Story by Lillian Putnam.

FORT CARSON, Colo. — Soldiers guarding Fort Carson’s gates have a new place to carry out their mission following the completion of a $1.4 million U.S. Army Corps of Engineers project to modernize the installation’s guard booths. The project delivered by the U.S. Army Engineering and Support Center, Huntsville’s Access Control Points team, upgraded guard facilities across the installation, improving the working environment for the personnel responsible for controlling access to the post.

“Our Access Control Points are more than just entryways to Fort Carson. They are the first line of defense for our Soldiers, families, and civilian workforce. Investing in these facilities means investing in the people who protect our installation every day,” said Christopher Wall, chief of Fort Carson’s Installation Physical Security Division.

The initiative originated with Maj. Gen. David Doyle, former commanding general of the 4th Infantry Division, who was inspired by the notable facilities he observed during his time overseas. After seeing modern guard booths in Europe, Doyle advocated for the upgrades to Fort Carson’s amenities to better support the guards securing the post.

The new booths were designed with both the needs of Soldiers and the installation’s building styles in mind. They are specifically equipped to handle harsh weather conditions. Each structure features heated floors and advanced temperature controls to help maintain a comfortable working environment during Colorado’s changing weather conditions.

“Without question, one of the most significant improvements has been the addition of a complete heating, ventilation, and air conditioning, HVAC, system,” Wall explained. “Our previous guard booths lacked a full HVAC system, making it difficult to maintain comfortable working conditions during Colorado’s extreme temperatures.”

For Soldiers who spend extended periods of time monitoring installation access points, the upgrades provide more than a cosmetic improvement. They offer a functional workspace designed to support personnel who must remain alert and focused while carrying out security responsibilities throughout the year.

“The reaction from our security personnel has been overwhelmingly positive,” the security chief said. “The positive feedback we’ve received from speaks volumes about the success of this project.”

The exterior design of the booths also reflects the installation’s existing architecture. The brick exterior was designed to complement Fort Carson’s main gate, helping the updates integrate with the surrounding area and maintain a consistent appearance across the base.

Shannon Webb, Huntsville Center ACP project manager, said the project enhanced security infrastructure while maintaining the guard’s mission.

“These access control booths demonstrate how facility improvements can strengthen installation security while directly supporting Directorate of Emergency Services personnel and Soldiers who operate them. The project enhances the security infrastructure at key access points and improves working conditions for personnel performing this critical mission,” she stated.

Despite facing challenges, the project team successfully brought the effort to completion, delivering the improvements envisioned for the installation. Replacing the outdated guard booths while maintaining daily access control point operations required careful planning and coordination.

“The installation process went exceptionally well from start to finish. The Huntsville Center and installation team did an outstanding job working closely with Fort Carson to ensure the project remained on schedule while minimizing disruptions to our security mission,” Wall recalled.

For Huntsville Center’s ACP team, the project demonstrated how engineering, contracting and project management expertise can help installations turn operational needs into practical infrastructure. Projects such as this require more than delivering a finished product; they require understanding the mission, coordinating multiple stakeholders and maintaining focus on the intended outcome throughout the execution process.

“What began as a commitment to better support DES personnel and Soldiers has become a lasting improvement for Fort Carson. This project reflects Huntsville Center’s focus on delivering reliable, mission-ready facilities that enable the people who safeguard the installation and support the Department of War’s mission every day,” Webb concluded.

Source: U.S. Army Corps of Engineers Engineering and Support Center, Huntsville

Understanding Global Threats

Browse All Topics & Pages

Complete sitemap with all intelligence resources

View Sitemap →

Related Preparedness Gear

Be prepared for evolving situations

Global Conflict Map

Live snapshot of conflict locations and tension zones worldwide.

Map data last updated: November 20, 2026

Related Alerts

Keep Exploring