NAVFAC Awards $10.6 Million Contract for F-35 Deployment Storage Facility at NAS JRB Fort Worth
- Command
- NORTHCOM
- Region
- United States ยท U.S. Northern Command
- Category
- Military affairs
- Source
- Naval Facilities Engineering Systems Command Southeast
At a glance
- What
- Military Affairs
- Who
- Naval Facilities Engineering Systems Command Southeast
- When
- Nov 19, 2026 at 5:08 PM UTC
Statement from Naval Facilities Engineering Systems Command Southeast, November 19. Story by Jeffrey Hamlin.
Naval Facilities Engineering Systems Command awarded a $10.6 million contract Nov. 17 to P & S Construction Inc., of Westford, Massachusetts, to construct a new F-35 deployment storage facility and logistics warehouse at Naval Air Station Joint Reserve Base Fort Worth, Texas. The project delivers a dedicated operational facility for the Air Force Reserve Commandโs 301st Fighter Wing, ensuring the unit possesses the logistical infrastructure needed to rapidly stage, equip, and deploy fifth-generation air assets worldwide.
"This new facility is all about speed and operational readiness. Rather than moving gear across outdated buildings scattered throughout the base, our teams will now have a single, dedicated hub to stage their equipment," said Lt. Jacob Haack, resident officer in charge of construction, Nas JRB Fort Worth. "This is the modern infrastructure our joint warfighters need to project F-35 airpower anywhere in the world at a moment's notice."
This project funds the construction of a state-of-the-art, 25,775-gross-square-foot logistics facility designed to streamline operations by consolidating vital mobility equipment and F-35 deployable aircraft parts under one roof. Engineered to support high-tempo operations, the new hub features advanced loading and unloading docks, dedicated parking, and pedestrian walkways. To ensure seamless, 24/7 functionality, the site will be built with comprehensive utility support systems and reinforced roadway access specifically designed to handle heavy military vehicle transit.
Additionally, the project includes the demolition of Building 1229, an existing 20,656-square-foot facility erected in 1942, eliminating maintenance costs and modernizing the base layout.
The requirement was competitively procured via the 2022 East Multiple Award Construction Contract, with three offers received. Fiscal 2027 Operation and Maintenance (Air Force) funds in the amount of $10.6 million are obligated at the time of award.
Work is slated for completion by May 10, 2028.
Source: Naval Facilities Engineering Systems Command Southeast