Defcon Level Warning System
Private OSINT (Open Source Intelligence) Alerts & News
Overall Current OSINT Defcon Level: 3 (Three) - Breaking | Raised | Early Alerts | Follow
FLASH | AFRICA | MIDEAST | CYBER | EUROPE | ASIA | USA | LATAM | SPACE | SPEC-OPS | STRAT | TRANS
  • Home
  • Current
  • About
  • Raised
  • Alerts
  • Levels
  • Follow

Chernobyl Nuclear Power Plant Current Situation March 22, 2022

Alerts | Articles | Contribute | Follow | Levels | Commands | Changes | Conflicts | Sitemap

Donald Standeford, Correspondent/Publisher By Donald Standeford, Correspondent - Follow -
Date Published: March 23, 2022 03:30PM UTC
Last Modified: March 23, 2022 03:30PM UTC

KYIV, UKRAINE - The following is a report put out by the State Nuclear Regulatory Inspectorate of Ukraine about the current situation regarding the current situation at the Chernobyl Nuclear Power Plant in Ukraine: "From the very beginning of the Russian military aggression against Ukraine, all Chornobyl NPP facilities, and facilities located in the Exclusion Zone are under the control of the aggressor-country military".

The regulatory control over the state of nuclear and radiation safety at the Chornobyl NPP site and in the Exclusion Zone, as well as control over nuclear materials at the enterprise is currently impossible to exercise.


According to the updated information received from the Chornobyl NPP, on 20 March 2022, it became possible to organize only a partial rotation of operational personnel who remained on the occupied site territory since 24 February 2022.


The day-time and repair personnel, as well as personnel of contractors, is absent on the Chornobyl NPP site.


The information received from the Chornobyl NPP on the on-site safety parameters and the radiation situation state indicates a trend of the steady deterioration of a number of indicators. The occupier continues to grossly violate the radiation safety requirements and strict access control procedures at the NPP and in the Exclusion Zone, which leads to deterioration of the radiation situation at the plant and in the Exclusion Zone and contributes to the spread of radioactive contamination outside the Exclusion Zone.


Scheduled activities, maintenance, and repair of systems and equipment of the Chornobyl NPP facilities, which must be performed by day-time personnel, are not carried out due to the occupation since 24 February 2022. In addition, the activities performed with the involvement of contractors’ personnel are not carried out.


It needs to be recalled that this situation has already led to the impossibility to restore the operation of individual neutron flux sensors, gamma radiation dose rate and radiation contamination sensors, further non-fulfillment of repair activities may lead to failures of other systems and components important to safety. The inoperability of the equipment complicates carrying out full control over the criticality and a number of radiation parameters in one of the Shelter premises.


Previous | Alerts | News | Intel | Early Access | Follow Us | Survival Gear | Archived
Like This Page? Share It! Clickable Share Link (Click Only Once!):

Add To Favorites

All Breaking Alerts
Current defcon level news and alerts
All Breaking News Alerts

All News Stories
Current defcon level news and alerts
All News Stories

News Archive - View Archived News And Alerts
News archive
Archived News And Alerts
Like Us? Share Us With Others!
defconlevel.com © 2013-2023, all rights reserved.

Share | Privacy | Disclaimer | Contribute | Contact | Advisories | Sitemap
Partner With Us Today!